Construction of the Northern Bypass Link Road in Kędzierzyn-Koźle
“Construction of the northern bypass link road with Przyjaźni/Strzelecka Streets, Blachownia housing estate in Kędzierzyn-Koźle”
Client:
Municipality of Kędzierzyn-Koźle (Gmina Kędzierzyn-Koźle)
Implementation period:
1 September 2023 – 15 May 2025
Value of works:
PLN 56.4 million net
Scope of works:
The scope of works included the construction of a 2.6 km class G road with two roundabouts, a bridge and a 304 m long viaduct over the Gliwice Canal and the Kłodnica, as well as wildlife crossings. The works also included storm drainage, retention tanks, the reconstruction of gas, power and telecommunications networks, and the installation of modern lighting and monitoring. The use of Corten-type steel in the bridge structure not only gave the structure a distinctive appearance but also ensured durability without the need for painting.
The task in figures:
Mass of embankment material built in – 104,500 tonnes,