31/05/2010
LCS Działdowo
Execution of construction works for the comprehensive modernisation of stations and line sections in the LCS Działdowo area under the POIiŚ 7.1-41 project “Modernisation of the E65/C-E 65 railway line on the Warszawa – Gdynia section – LCS Działdowo area”
Zamawiający:
PKP Polskie Linie Kolejowe S.A. - Head Office
Okres realizacji:
06/2010 - 11/2013
Zakres robót:
The scope of works includes the modernisation of a double-track railway line over a length of 54 km, including:
- modernisation of track layouts together with modernisation of the trackbed, drainage and trackside infrastructure and platforms,
- overhead contact line,
- railway traffic control equipment,
- telecommunications equipment and networks, together with passenger information,
- non-traction power line,
- engineering structures: railway viaducts – 2 pcs, pedestrian underpasses – 5 pcs,
- railway maintenance buildings,
- environmental protection structures.