Kurs otwarcia: TRK 3.4250 Kurs bieżący: TRK 3.4500 D/D-1: 0.0300 (0.88%) Więcej
PL | EN
 
5/10/2015

Continuation of E59 Mosina – Luboń

Continuation of modernisation works on railway line E59 (track and track bed works and trackside works) under POIiŚ Project 7.1-5.1 “Modernisation of railway line E59 on the Wrocław-Poznań section, Stage III, Czempiń-Poznań section” – LOT C MOSINA-LUBOŃ

Zamawiający:

PKP Polskie Linie Kolejowe S.A. – Head Office

Okres realizacji:

10/5/2015 - 12/21/2017

Wartość robót:

PLN 164.7 million

Zakres robót:

The contract covers comprehensive modernisation of the Poznań – Czempiń section. Under the task, the railway line will be adapted to a speed of 160 km/h, with elements of solutions for a speed of 200 km/h. The scope of the investment includes track works with track bed and level crossing surfaces, dismantling of the overhead contact line, power engineering and drainage works. The works will also cover modernisation and construction of engineering structures and reconstruction of access roads.

Top