Kurs otwarcia: TRK 3.2300 Kurs bieżący: TRK 3.2800 D/D-1: 0.0400 (1.23%) Więcej
PL | EN
 
7/03/2024

Construction of a Road Layout with Technical Infrastructure in Łękińsko

Construction of a road layout with technical infrastructure in Łękińsko in the area of Łąkowa, Północna, Rolna and Ustronna Streets – part 1: construction of a road layout approx. 1.27 km long with technical infrastructure between Łąkowa and Rolna Streets in Łękińsko + part 2: construction of a road layout approx. 1.91 km long with technical infrastructure in the area of Rolna Street in Łękińsko

Zamawiający:

Municipality of Kleszczów

Okres realizacji:

19 April 2023 –

Wartość robót:

PLN 38.5 million net

Zakres robót:

The tasks include the construction of more than 3 km of carriageway, a shared pedestrian and vehicular route, pavements, cycle paths, junctions and individual driveways to plots.
The scope of this investment also includes the extension of complete technical infrastructure, comprising the water supply, sewerage and gas networks, street lighting, and the power engineering and telecommunications networks with connections to plots.

Top