26/05/2017
Revitalisation of Railway Line No. 405, Voivodeship Border-Słupsk-Ustka Section
Task A: Preparation of documentation and execution of construction works as part of the project “Revitalisation of railway line No. 405 Voivodeship border – Słupsk – Ustka section; Task B: Design and execution of the installation of railway traffic control (srk) equipment from Szczecinek station km 71.480 to km 104.515, carried out as part of the project “Improvement of safety and elimination of operational hazards on the railway network”
Client:
PKP Polskie Linie Kolejowe S.A.-Head Office
Implementation period:
5/26/2017
Value of works:
PLN 165.0 million
Scope of works:
Under the task, nearly 90 km of railway line No. 405 will be rebuilt on the section from the border of the Pomeranian Voivodeship to Ustka. The investment provides for the replacement of the overhead contact line and the track structure, strengthening of the subgrade, as well as the reconstruction of 53 level crossings, 8 viaducts and 4 bridges. 26 platforms will also be revitalised – the facilities will receive new lighting, shelters and small architectural elements. In addition, a new pedestrian underpass beneath the tracks will be built at Kępice station. The task will also include works in the telecommunications, power engineering, sanitary and railway traffic control disciplines. After the modernisation is completed, passenger trains will speed up to 100 km/h on the route, and freight trains to 80 km/h.