Reconstruction of Plac Wolności in Łódź

Reconstruction of Plac Wolności together with technical infrastructure, relocation and conservation of the fountain, small architecture and plantings, and construction of a canopy over the entrance to the “Dętka” Canal Museum – a Branch of the Museum of the City of Łódź

Client:

Łódź City Office (Urząd Miasta Łodzi, UMŁ)

Implementation period:

3/14/2022 - 02/2024

Value of works:

PLN 27.2 million

Scope of works:

  • dismantling of elements of the existing land development
  • dismantling of elements of infrastructure and small architecture of historical value
  • dismantling of underground infrastructure and the underground chamber
  • reconstruction of the carriageway and the track layout
  • reconstruction of the pedestrian surfaces of the square
  • production and installation of small architecture elements
  • change of the permanent traffic organisation
  • reconstruction of public transport stops and platforms
  • reconstruction of the tramway overhead contact line, the turnout control and heating installations, the traction cables and the overhead contact line
  • felling and transplanting of trees and shrubs
  • conservation of the existing traction and lighting poles
  • relocation and conservation of the fountain
  • planting of low and tall greenery
  • repair of bricks and cleaning of the interior walls of the “Dętka” canal
  • renovation of the plinth of the Tadeusz Kościuszko monument, including the steps leading to the monument
  • reconstruction and protection of the existing power grid
  • construction of street lighting and lighting of the pedestrian spaces of the square
  • reconstruction and protection of the existing telecommunications ducting
  • construction of a technological duct
  • construction of water supply connections
  • installation of illumination of building façades, the monument, the fountain and greenery
  • construction of Passenger Information Boards together with the necessary cable ducting and cabling
  • construction of new elements of the storm drainage system, together with a drainage system based on street inlets and drainage pipes,
  • construction of an irrigation system for the planned greenery