Closing rate: TRK 3.5000 Daily change: 0.0000 (0.00%) More
PL | EN
 
2/11/2021

Extension of the Transport Layout with Construction of a Road Overpass over the Railway Tracks in Skarżysko-Kamienna

Extension of the transport layout together with the construction of a road overpass over the railway tracks in Skarżysko-Kamienna as part of: “Construction of an integrated transport system comprising the reconstruction of the existing transport layout together with the construction of a structure to cross railway line no. 8 Warsaw-Kraków and to connect the Dolna Kamienna Estate with the Przydworcowe Estate in Skarżysko-Kamienna”.

Client:

County Roads Authority in Skarżysko-Kamienna (Zarząd Dróg Powiatowych w Skarżysku-Kamiennej)

Implementation period:

02/2021 - 12/2022

Value of works:

PLN 28.3 million

Scope of works:

  • construction of a road overpass over the railway tracks
  • extension of the transport layout on the section from Al. Tysiąclecia PP to the intersection with ul. Towarowa, together with intersections with Al. Tysiąclecia PP, Al. Niepodległości through the construction of a turbo roundabout, ul. Towarowa, including: construction of carriageways, bus lanes, pavements, a pedestrian and cycle path, green areas, individual and public driveways, felling of conflicting trees and shrubs together with extension of the storm sewer system, street lighting, reconstruction of the water supply network, power networks, sanitary sewer system, telecommunications networks, the gas network and the heating network, construction of a technological duct, demolition works: of the overpass together with the structure for the heating network, fences and the gatehouse building”
Top