Preparation of design documentation and construction works related to the construction of Warszawa Główna station under the POIiŚ 5.1-13 project entitled: “Works on the cross-city line in Warsaw on the Warszawa Wschodnia – Warszawa Zachodnia section”
Client:
PKP Polskie Linie Kolejowe S.A. - Head Office
Implementation period:
3/2018 - 02/2023
Value of works:
PLN 80.9 million
Scope of works:
The scope of works included the reconstruction of the existing track layout, including four main tracks along the platforms and a fifth connecting track. Two island platforms with individual shelters were built and modern lighting and small architecture elements, adapted to persons with disabilities and persons with reduced mobility, were installed. Under the task, a pedestrian and cycle footbridge was built over the tracks, connecting Aleje Jerozolimskie with Kolejowa Street. The footbridge is about 200 m long and 4 m wide.