Construction of Temporary Platform No. 5 at Warszawa Gdańska Station

Construction of temporary platform No. 5 at Warszawa Gdańska station

Client:

PKP Polskie Linie Kolejowe S.A.

Implementation period:

3 August 2023 –

Value of works:

PLN 12 million

Scope of works:

Design and construction of a temporary side platform (200 m long and 5 m wide) at Warszawa Gdańska station, on line No. 509 Warszawa Główna Towarowa – Warszawa Gdańska, together with drainage, access walkways to the platform from the western footbridge side and from Ks. R. Indrzejczyka Street in the area of the pedestrian crossing.