2/11/2010
Podłęże – Bochnia
Design and execution of construction works on the Kraków – Medyka – state border railway line, on the Podłęże – Bochnia section at km 16.000 – 39.000; Tender 1.1
Client:
PKP Polskie Linie Kolejowe S.A. - Head Office
Implementation period:
11/2/2010 - 10/7/2016
Value of works:
PLN 642.0 million
Scope of works:
The scope of works includes the modernisation of a double-track railway line over a length of 23 km:
- design documentation,
- track layout and track drainage,
- overhead contact line,
- traffic control and diagnostics equipment,
- telecommunications networks and equipment,
- non-traction power networks and equipment,
- engineering structures: culverts – 40 pcs, viaducts – 15 pcs, bridges – 2 pcs,
- level crossings and access roads,
- buildings, platforms, small architecture and sanitary networks.