Closing rate: TRK 3.5000 Daily change: 0.0000 (0.00%) More
PL | EN
 
30/06/2011

Łódź Fabryczna-Łódź Widzew

Design and execution of the reconstruction of Łódź Widzew station and part of the Łódź Fabryczna Łódź Widzew line from km 2.250 to km 7.200 together with railway traffic control (srk) and telecommunications equipment for the entire Łódź Fabryczna Łódź Widzew section and the modernisation of the Łódź Widzew – Łódź Chojny – Łódź Kaliska bypass line

Client:

PKP Polskie Linie Kolejowe S.A.

Implementation period:

6/30/2011 - 8/30/2016

Value of works:

PLN 352.7 million

Scope of works:

Modernisation of a railway line over a length of 22 km of single track, including:

  • design documentation,
  • track superstructure and subgrade,
  • overhead contact line together with power supply,
  • railway traffic control (srk) equipment,
  • telecommunications equipment and systems,
  • power engineering equipment and systems up to 1 kV,
  • engineering structures: culvert – 1 pc, bridge – 1 pc, viaducts – 4 pcs, pedestrian underpass – 1 pc,
  • platforms and buildings,
  • pedestrian crossings and level crossings,
  • environmental protection facilities.
Top