27/07/2015
Modernisation of Railway Line No. 8, Warszawa Okęcie-Radom Section (LOT A, B, F)
Preparation of detailed designs and execution of works for the LCS Warszawa Okęcie as part of the POIiŚ 7.1-19.a project entitled “Modernisation of railway line No. 8, Warszawa Okęcie-Radom section (LOT A,B,F)”
Client:
PKP Polskie Linie Kolejowe S.A.-Head Office
Implementation period:
7/27/2015
Value of works:
PLN 376.2 million
Scope of works:
The contract provides for the reconstruction of 27 km of tracks, 13 level crossings and 75 km of overhead contact line. As part of the task, the Warszawa Okęcie, Piaseczno and Czachówek Południowy railway stations and 6 passenger stops will be modernised. The works will also include the construction of 10 platforms and pedestrian crossings, the installation of new shelters and the installation of passenger information equipment. In addition, the scope of the investment includes the construction of over a dozen engineering structures, including 7 viaducts, 4 railway bridges and 16 culverts, as well as drainage and the installation of power engineering equipment.