Ełk Południe Interchange – Wysokie Interchange

Design and construction of the S61 expressway Szczuczyn – Budzisko (state border) divided into tasks” Task No. 2: section Ełk Południe Interchange – Wysokie Interchange (including a junction arm along national road DK 16)

Client:

General Directorate for National Roads and Motorways (GDDKiA), Olsztyn Branch

Implementation period:

7/2018 - 05/2023

Value of works:

PLN 685.9 million

Scope of works:

Under the task, more than 19 km of the S61 road will be built on the section from Ełk Południe Interchange to Wysokie Interchange, as well as a section of the S16 road 3.425 km long. The scope of the contract includes all works necessary for the proper functioning of the expressway. Apart from the construction of sections of the S61 and S16, the works will include, among others, the reconstruction of existing roads, the construction of engineering structures, infrastructure for pedestrians and cyclists, link roads, road traffic safety equipment and emergency crossings. In addition, drainage, a telecommunications network and lighting will be built, and environmental protection equipment will be installed.

Top